This project is to provide noise control for two split type compressor sets and arrange an independent blow-off silencer for the air cooler section. The wall structure is a double- composite sound-absorbing body, of which the inner is a porous sound-absorbing structure. The overall reduction capacity is up to 35-40dB (A). After treatment, the noise can meet the requirements of Class II standards.
Noise Reduction Works at the Booster and Dehydration Station of Sebei Gas Field Boosting, Gathering and Transportation Project (PetroChina)
MoreGaomiao Booster Station Noise Reduction Project (Sinopec)
MoreDianjiang Technical Renovation and Noise Control Project (PetroChina)
MoreDongping Gas Gathering and Dehydration Station Project (PetroChina)
More